Gallery

PISAS, Inc. in Projects:

Pulling out of Sprocket prior to inspection and replacement of bearing

Erection for Scaffolding at IDF Alpha and Bravo

Erection for Scaffolding Inside Boiler / Furnace

Water Pressure washing (Cleaning Procedure Plate Heat exchanger)

Erection for Scaffolding at Blowdown Pipes

Air-preheater Basket Element Replacement

Erection for Scaffolding Inside Cyclone Area

Erection for Scaffolding at Turbine Areas

Fabrication and Installation of Air Ventilation Supply and Exhaust Ducting including Insulations and Claddings

Unloading and Hauling of Scaffolding Materials

Inspection and Repair of Travelling Band Screen 1A & 1B.

Good Housekeeping