PISAS, Inc. in Projects:
Pulling out of Sprocket prior to inspection and replacement of bearing
Erection for Scaffolding at IDF Alpha and Bravo
Erection for Scaffolding Inside Boiler / Furnace
Water Pressure washing (Cleaning Procedure Plate Heat exchanger)
Erection for Scaffolding at Blowdown Pipes
Air-preheater Basket Element Replacement
Erection for Scaffolding Inside Cyclone Area
Erection for Scaffolding at Turbine Areas
Fabrication and Installation of Air Ventilation Supply and Exhaust Ducting including Insulations and Claddings
Unloading and Hauling of Scaffolding Materials
Inspection and Repair of Travelling Band Screen 1A & 1B.
Good Housekeeping